Meadowvale all ages and abilities friendly Precinct Development

Modbury, South Australia | PROGRESS: DETAILED DESIGN REVIEW

BEENGS consultants are tendering for the project set-out by the City Council of Tea Tree Gully, in affiliation with ECH, and collaboration with the University of South Australia. The project is funded by the Office for Aging Well regarding the design and delivery of a framework.

​

Collectively, our aims are to deliver innovative solutions to facilitate pedestrian and cyclist traffic throughout the entire precinct, the entire area & infrastructures are designed to be DDA compliant. The precinct offers accessibility for all-ages and all-abilities, therefore BEENGS have designed the entire precinct connectivity infrastructure to be DDA compliant, whilst precinct elements such as the playground and community garden to be all-ages and ability friendly. Additionally, the precinct is designed to be equipped with surveillance, additional solar panelled lighting, and emergency towers for added safety – providing a welcoming and safe environment.

​

The precinct still inhabits its natural forest-like feel, with added timber decked bridges, stone gabion walls, a creek realignment to mitigate soil erosions and vegetation clean-up and regrowth.

Other added amenities included are ample shelter & seating areas, large community open spaces, barbeque facilities, bike-track area, universal toilet facility and more.

​

All BEENG department has been heavily involved in all aspects from tender to detailed design. To view our progress, download the documents below.

Capture.PNG
1) Tender Stage

March 2020

Tender Report

2) Feasibility Stage

May 2020

Feasibility Study Report

Feasibility Environmental Management Plan (EMP)

3) Detailed Design Stage

June 2020

Detailed Design Report inc. EMP

CAD Drawings

Project Timeline

The BEENGS team, we would like to express our gratitude to Mark and Rachael for helping us throughout the semester! Also a big thank-you to Victoria for supplying us the opportunity to work on this project! 

 

BEENGS 20 June 2020

If you do have any enquiries, please contact our management team
image0_edited_edited.jpg
Project Manager
Brandon
Turton
  • LinkedIn
64993995_2109636619162302_54391068165522
Assistant Project Manager
Kaela
Santillan
  • LinkedIn
bottom of page